RECENT AND CURRENT PROJECTS
Please browse through a selection of our recent jobs below and head over to our Testimonials page to see what the clients say #impeccable
CATERHAM
Detached 4 bedroom house - Internal reconfiguration - Drainwork - Steelwork - Bi-fold doors - 80 sq.mt. patio
 Utility & Existing Consumer UnitDay 1 - Demolition of Utility Area |  Utility & Existing Consumer UnitKnocking through into downstairs bedroom |  Rear of propertyInternal Demolition complete |
---|
 New UtilityConstruction of Utility room cupboard |  Internal ReconfigurationConsumer Unit re-sited to corner of building. Soil pipe needing re-routing to accommodate bi-folds. |  Drainwork dig outNew soil pipe run dug out ready for re-routing |
---|
 New soil pipe runNew soil run, backdropped into manhole, ready for connection. New electric meter in place to left of building |  New UtilityConstruction of utility room wall |  DemolitionAcrow Props in place to support ceiling, down comes the wall |
---|
 Demolition |  Brickwork & WindowsOld bedroom window removed, new brickwork to accommodate smaller utility room window |  Steelpost FoundationsNew foundation pads for steel posts in place |
---|
 SteelworkFinal check over before steels are fitted |  SteelworkMain beam lifted into position |  SteelworkMain beam supported by two posts on pad foundations |
---|
 Bi-fold Installation5 metre bi-fold doors installed seamlessly. Utility room construction finished |
---|
STOCKWELL
Ex Local Authority Flat - Converted from 3 to 4 bedrooms - Complete Renovation
 WP_20170303_10_13_52_Pro |  WP_20170316_13_31_23_Pro |  WP_20170308_08_03_30_Pro |
---|
 download |  77465_1936096_IMG_05_0000_max_656x437 |  77465_1936096_IMG_01_0000_max_656x437 |
---|
 77465_1936096_IMG_04_0000_max_656x437 |  WP_20170316_13_32_52_Pro |  WP_20170316_13_32_22_Pro |
---|
 Basil room |  TOILET |  Thyme room |
---|
 BATHROOM I |  Sage room I |  Rosemary room I |
---|
 BATHROOM II |  HALL |
---|